Short Project
Optimistic Time (a): 1 days; Most Likely Time (m): 2 days; Pessimistic Time (b): 3 days
Variance (V): 0.1111111111 days²; Expected Time (E): 2 days
Calculates the expected project duration and variance using optimistic, pessimistic, and most likely time estimates.
Start with your values, or try a preset.
Enter Optimistic Time (a), Most Likely Time (m), and Pessimistic Time (b) in the units shown.
Read Variance (V) and Expected Time (E) in the results panel. Results update as you change the inputs.
Choose a preset to load an example, then adjust the values for your situation.
See the inputs and their calculated results.
Optimistic Time (a): 1 days; Most Likely Time (m): 2 days; Pessimistic Time (b): 3 days
Variance (V): 0.1111111111 days²; Expected Time (E): 2 days
Optimistic Time (a): 2 days; Most Likely Time (m): 5 days; Pessimistic Time (b): 8 days
Variance (V): 1 days²; Expected Time (E): 5 days
Optimistic Time (a): 4 days; Most Likely Time (m): 8 days; Pessimistic Time (b): 12 days
Variance (V): 1.777777778 days²; Expected Time (E): 8 days
Continue with another tool on a related topic.
Estimates the strength of a password based on its length and character set diversity, measured in bits of entropy. Higher entropy values indicate stronger, more secure passwords.
Estimate a Minecraft stronghold from two Eye of Ender throw positions and yaw angles. Includes negative coordinates, direction checks, and clear instructions.
Calculates the number of full stacks and remaining items for a given quantity of an item in Minecraft.
Calculates the hit points (HP) for characters or monsters in Dungeons & Dragons 5th Edition, based on their Constitution modifier and Hit Dice.